Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Spring / Summer backyard tower project
#17
According to the weatherman, Saturday looked like a good day to build a 2 x 4 frame around my tower base so I can suspend it over the opening above the hole.  Unfortunately, the rain got its way, but only after I had all my tools out.  Last week the rain percolated its way through the soil and my hole has 2' of water in it.

On a positive note, I may have a solution for my concrete.  Classic Concrete has done work for me in the past shoring up my foundation and pouring a concrete pad.  I talked to them Friday morning and they are not having any problems getting concrete.  Their office left me a message last night about getting concrete delivered this week so the 'pour' could happen much sooner than expected.  Apparently the concrete has to cure for 30 days before I can put the tower up.

73

[Image: IMG_2544.JPG]
Reply


Messages In This Thread
RE: Spring / Summer backyard tower project - by Rob_Walker - 2020-05-02, 12:22:08

Forum Jump:


Users browsing this thread: 26 Guest(s)