2020-05-02, 12:22:08
According to the weatherman, Saturday looked like a good day to build a 2 x 4 frame around my tower base so I can suspend it over the opening above the hole. Unfortunately, the rain got its way, but only after I had all my tools out. Last week the rain percolated its way through the soil and my hole has 2' of water in it.
On a positive note, I may have a solution for my concrete. Classic Concrete has done work for me in the past shoring up my foundation and pouring a concrete pad. I talked to them Friday morning and they are not having any problems getting concrete. Their office left me a message last night about getting concrete delivered this week so the 'pour' could happen much sooner than expected. Apparently the concrete has to cure for 30 days before I can put the tower up.
73
On a positive note, I may have a solution for my concrete. Classic Concrete has done work for me in the past shoring up my foundation and pouring a concrete pad. I talked to them Friday morning and they are not having any problems getting concrete. Their office left me a message last night about getting concrete delivered this week so the 'pour' could happen much sooner than expected. Apparently the concrete has to cure for 30 days before I can put the tower up.
73